WP8 – Integration, Pilots, and Validation

 Coordinated by
HS (M09-M36)

Objective

This work package has the following objectives:

  1. Develop a cloud platform, according to the reference architecture of WP2, that host the verification and validation activities within BIECO, as well as the applications and datasets of the pilots.
  2. Develop the business case implementations.
  3. Provide a set of front-end applications for enabling the back-end services developed in the project.
  4. Establish a common integration, testing and verification strategy for the various software implementations of the BIECO framework.
  5. To test the BIECO framework and tools.
  6. To validate and verify the BIECO framework, consisting of platform, security tools and business case applications.
  7. To test and validate the use cases, both from the technological and business perspective.

Objectives

Outcomes

WP6 monthly meeting M7

WP6 monthly meeting M7

The 1st March took place the WP6 monthly meeting. IESE presented their tool called SafeTbox and they introduced the Conditional Safety Certificates (ConSerts). During this monthly meeting, IESE presented their tool called safeTbox, a tool for modelling and safety...

WP6 monthly meeting M6

WP6 monthly meeting M6

The 1st February took place the WP6 monthly meeting. During the meeting it was presented ResilBlockly, the new refactored and extended version of the Blockly4SoS tool. The main focus of this call was on the presentation of Blockly4SoS and on the live demo of the new...

WP6 monthly meeting M5

WP6 monthly meeting M5

The 11th January took place the WP6 monthly meeting. Resiltech shared a document with requirements for the extension of Blockly4SoS. It has also been decided that MUD files will be an input of the modelling activities. Resiltech shared a document with requirements for...

WP6 Monthly meeting M4

WP6 Monthly meeting M4

The 7th December took place the WP6 monthly meeting. The partners discussed about the preliminary results of tasks T6.1 and T6.2. During the meeting, the partners discussed about the preliminary results of tasks T6.1 and T6.2, shared by Resiltech, leader of the two...

Bieco WP5 – Kick Off meeting

Bieco WP5 – Kick Off meeting

On 2th December 2020, we had a remote Kickoff Meeting for WP5 of the European cybersecurity project @bieco_org. It was a great meeting with participants from Portugal, Germany, Italy, Romania, Spain, Austria and Poland. Due to COVID-19 situation, the meeting was held...

Kick-Off meeting of WP4

Kick-Off meeting of WP4

On 12th of November, we had the internal Kick-Off meeting of WP4, led by Fraunhofer IESE. Within WP4, methods and tools are developed for assuring system resilience based on runtime evaluation of (Software) component behaviours. Specifically, in a runtime...

BIECO Project

SUBSCRIBE and become part of the BIECO community!

We don’t spam!

Share This